5 Things to Know Before Buying Apple Cabin

05 May.,2025

 

Apple cabin The Smart Choice for Business & Leisure Travelers Alike

1. Who are we?

Zhongxinjian Product Page

We are based in Shandong, China, start from ,sell to Mid East(30.00%),Southeast Asia(20.00%),Domestic Market(10.00%),North America(10.00%),South Asia(10.00%),South America(10.00%),Central America(5.00%),Africa(5.00%). There are total about 11-50 people in our office.

2. What is your package?

Container house is in flat pack. Other houses will be loaded into shipping containers(main structure and panels in bulk, door/ceiling/floor tiles/furniture in cartons, sanitary/electrical/plumbing/hardware/fittings/tools in wooden case ).

3. How about your delivery time?

Normally, the delivery time is as follows: Prefab house: 20-25days, Container house: 15-20days, Steel structure: 25-30days, Villa: 30-35days.

4. Can you customize this product?

We can optimize the budget production according to your needs and drawings.

5. How can iplace an order?

Firstly we need your layout or hand-made drawing, Secondly we design for you and confirm the quantity and design, Thirdly we sign contract and arrange production. Finally we delivery goods and arrange shipping. 

6. Why should you buy from us not from other suppliers?

As one of the biggest stage truss factory in China for 8 years, We can supply high quality

performance products, such as: aluminum alloy light frame, truss frame ,aluminum frame, flexible stage ,rack, sub-frame ,air box and other performances .

7. What services can we provide?

Our RD team containuously research the market demands and develop rarious designs to provide you with unique and practical schemes. Our Team possesses the very rich experience in this industry and ready to provide you with very professional supports and advice.

1. Accepted Delivery Terms: FOB,CFR,CIF,EXW;

2. Accepted Payment Currency:USD;RMB;

3. Accepted Payment Type: T/T,L/C,Credit Card. 

8. What the value added service do you have?

We have camp/community planning design, indoor and outdoor electrical/plumbing design, communication/fire alarm/security system supply,furniture/ electric appliance offer, etc. we have 80 experienced supervisors who could go to guide the installation at any time.Meanwhile, we have skilled installation team who could finish some turn-key projects.

What Is the Installation Process of an Apple Cabin House? - Steelmark

As a new type of mobile home, the installation process of Apple Cabin House is relatively simple and efficient.

The following are the general steps for installing an Apple cabin house:

Contact us to discuss your requirements of Prefab Camping Resort House. Our experienced sales team can help you identify the options that best suit your needs.

Site preparation:

Before installing the Apple Cabin house, it is necessary to choose a suitable location. This site needs to be flat and solid to ensure that the Apple Cabin can be stably placed.

The size of the venue should be determined based on the dimensions of the Apple Cabin building to ensure that the building can be fully unfolded and secured.

Basic processing:

A significant advantage of Apple Cabin houses is that they do not require a foundation, greatly simplifying the installation process.

But in order to ensure the stability and safety of the house, sometimes it may be necessary to lay a layer of moisture-proof pad or perform other foundation treatments on the ground.

House unfolding:

Remove the Apple Cabin from the transport vehicle and place it on the prepared site.

Use specialized tools or equipment to unfold the house from a folded or contracted state to a fully unfolded state.

Fixed and connected:

Use specialized connectors or fasteners to secure the various parts of the Apple Cabin house together.

Ensure that all connection points are secure and reliable to prevent the house from shaking or deforming during use.

Installation of supporting facilities:

Install supporting facilities such as doors, windows, electrical circuits, and water supply and drainage systems as needed.

Ensure that all facilities are functioning properly and comply with relevant safety standards.

Acceptance and adjustment:

After installation, conduct a comprehensive inspection and acceptance of the Apple Cabin building.

Ensure the structural integrity and stability of the house, and that all facilities are functioning properly.

If any problems are found, adjust and repair them promptly.

The entire installation process usually takes several hours to several days, depending on the size and complexity of the house, as well as the experience and efficiency of the installation team. Generally speaking, smaller Apple Cabin houses may only take a few hours to complete installation, while larger houses may require longer time.

Overall, the installation process of the Apple cabin house is relatively simple and efficient, and can meet the usage needs in different scenarios. Meanwhile, due to its mobility and flexibility, Apple cabins have become an increasingly popular choice among people.